GEOMACK, the world leader in combating geopathic stress and electro stress

Case Study 03

Mrs Elaine Plant, United Kingdom

Mrs Plant’s family was being systematically drained of natural energy with serious consequences. Her son had signs of becoming diabetic and her daughter was suffering from ME type illnesses together with recurrent glandular fever. Mrs Plant refused to accept the doctor’s diagnosis that she had cancer and should have a full colostomy. Having been a very active and healthy family, Mrs Plant was completely at a loss as to understand why the family had so many problems. It was proved to Mrs Plant that stress caused by the presence of underground running water, underground electricity cables, overhead power cables and local transformers, had virtually destroyed her immune system and that of the family. After two months with the Geomack unit, all the family noticed a definite improvement in their health. Mr Plant was so impressed that he purchased a portable Geomack which he stands on his desk at work and finds that he no longer has any of the tiredness symptoms associated with his working environment.